Case study · Renovation / Flooring

Renovation / Flooring: Nadia C.'s journey with the ORKYO Business Scan.

A request turns into a site visit, measurements, a quote, a materials order, scheduling, and then the job — and changes requested along the way make it harder to track.

These case studies are examples designed to illustrate how ORKYO works.

See all trades

The illustrative case

Portrait of Nadia C., owner of a renovation / flooring business

Nadia C.

Owner — Renovation / flooring company

Sector
Renovation and flooring company: wood, laminate, tile, and small projects
Headcount
9 people
What the business does
Each project runs through a site visit, measurements, a quote, a materials order, scheduling, and execution.

The starting situation

A typical week: site visits to quote, quotes sent that are awaiting a decision, changes agreed verbally on site, extra work done with no written record, final invoicing still waiting, and payments tracked from memory.

  • Changes requested during the work aren't always written down.
  • An accepted quote moves to execution based on informal conversations.
  • Extra work is done without written approval.
  • Some finished jobs wait for their final invoice.

Information requested to put the Business Scan in context

Sector — Renovation / flooring

Headcount range — 6 to 10 employees

Company context

Current setup
Job tracking shared between the owner and the crews on site
Illustrative activity
Small renovation and flooring projects for homeowners
Main difficulty
Changes agreed verbally don't make it into the final invoice

These details describe the scenario shown. Not all of them correspond to fields requested in the Business Scan, and no data is automatically retrieved from the company's software.

What the Business Scan reveals

The owner answers the ORKYO Business Scan V3: 17 questions covering customer acquisition and engagement, planning and execution, billing and money, and infrastructure and continuity. Each question has two parts and four answer levels. The questionnaire is the same for every business; results are then put in context based on sector, headcount, reported impacts, and the owner's validations.

The four sections

  1. 1. Customer acquisition and engagement
  2. 2. Planning and execution
  3. 3. Billing and money
  4. 4. Infrastructure and continuity

How it works

  • • 17 questions
  • • 2 parts per question, so 34 parts total
  • • 4 answer levels per part
  • • About 10 minutes
  • • Available without an account; creating one is optional
  • • Can be saved to an ORKYO space and resumed securely
  • • Explanatory guide available throughout the questionnaire
  • • An overall maturity score and 8 scores by dimension
  • • A reported-impact step, followed by context from sector and headcount
  • • Owner validation, then an optional choice of 0 to 3 priorities
  • • A personalized summary distinguishing ORKYO's urgency ranking from the recommended operational order

Dimensions likely to come up in this scenario

  • Devis et conversion
  • Planification et capacité
  • Exécution / intervention
  • Facturation

Actual results depend solely on the answers and impacts reported by the owner.

Example of possible findings

Customer decisions poorly tracked

Accepting a quote and its terms rests on informal conversations.

Job-site changes undocumented

Changes agreed on site aren't all logged.

Extra work not linked to the job

Extras aren't connected back to the job they belong to.

Final invoicing delayed

Without a clear closing trigger, final invoicing waits.

Owner validation

ORKYO doesn't decide on the owner's behalf. Every finding is put to them, and they respond using the options shown in the app:

  • Yes, it's important
  • Yes, but not a priority
  • No, that doesn't apply
  • I'd like to discuss it

The priorities chosen

  1. Track quotes and customer decisions
  2. Keep a record of changes made during the job
  3. Fold extra work into the final invoice

In this example, the owner chooses these priorities. A real user can select 0, 1, 2, or 3.

Why were these priorities chosen?

Track quotes and customer decisions

Finding
Customer decisions poorly tracked
Impact on the owner or team
Projects started without a written scope
Why this priority was chosen
The accepted scope is the reference point for the whole job.
Desired benefit
Start from a confirmed scope.
First concrete action
Log the quote's acceptance and its scope.

Keep a record of changes made during the job

Finding
Job-site changes undocumented
Impact on the owner or team
End-of-job disputes over what was agreed
Why this priority was chosen
An unwritten change gets argued about at payment time.
Desired benefit
A clear history of approved changes.
First concrete action
Write down and approve every change agreed on site.

Fold extra work into the final invoice

Finding
Extra work not linked to the job
Impact on the owner or team
Work done that's missing from the invoice
Why this priority was chosen
What isn't linked to the job won't get invoiced.
Desired benefit
A complete, justified final invoice.
First concrete action
Attach every approved extra to its job.

A file, from request to payment

  1. 1. Customer request

    A customer wants the flooring redone in two rooms; the request is logged.

  2. 2. Preparing the quote

    Measurements, materials, and timelines are gathered in one job file.

  3. 3. Sending the quote

    The quote is sent with a written, dated scope.

  4. 4. Following up on the quote

    With no decision, a follow-up is scheduled rather than left to chance.

  5. 5. Customer acceptance

    The acceptance and confirmed scope are logged before work starts.

  6. 6. Scheduling the work

    The job is scheduled once materials are ordered.

  7. 7. Doing the work

    Every change agreed on site is written down, approved, and attached to the job.

  8. 8. Preparing and sending the invoice

    The final invoice picks up the original scope plus approved extra work.

  9. 9. Following up on an unpaid invoice

    The unpaid balance shows up among the follow-ups to do.

  10. 10. Receiving and recording payment

    The final payment is recorded and the job is closed.

This example describes a recommended path, from the customer's request to payment. It does not describe an automation already performed on the owner's behalf.

The gain being sought

The gain being sought

  • Immediately find the status of a file.
  • Know which quote needs a follow-up.
  • Spot finished work that needs to be invoiced.
  • Identify an unpaid invoice to follow up on.
  • Limit duplicate data entry and information searches.
  • Reduce follow-ups done from memory.
  • Spend more time on clients, operations, and growth.

If 8 jobs or quotes a week each require 10 minutes of avoidable searching or follow-up, better organization could free up about 1 h 20 per week.

This illustrative estimate is not a promise of results. The actual gain depends on the business's volume and organization.

Before / with a more structured organization

Before

  • • Scattered information
  • • Follow-ups done from memory
  • • Forgotten quotes
  • • Delayed invoicing
  • • Irregular follow-ups
  • • Limited visibility into payments

With a more structured organization

  • • File status visible
  • • Next action identifiable
  • • Quote tracked
  • • Finished work passed on to invoicing
  • • Invoice followed up on
  • • Payment recorded
  • • Owner less dependent on memory

ORKYO urgency ranking

  1. 1. Keep a record of changes made during the job
  2. 2. Fold extra work into the final invoice
  3. 3. Track quotes and customer decisions

Recommended operational order

  1. 1. Quotes and scope confirmed
  2. 2. Changes logged
  3. 3. Extra work approved
  4. 4. Final invoicing prepared